18mm Heavy Series Pipe clamp DIN 3015, Part 2
Sizes:Rang of O.D. 6mm to 406mm
Working Temperature
PP -30 degree up to +90 degree in dark green color
PA -40 degree up to +120 degree in dark color
AL -50°C up to +300°C Natural color
Q235 -80°C up to +500°C Galvanizing or parkerising
SUS304 or SUS316 -80°C up to +500°C Natural color
18mm Heavy Series Pipe clamp DIN 3015, Part 2
This DIN 3015 Part 2 heavy series 18mm pipe clamp is engineered for heavy-load hydraulic, machinery, marine and construction pipeline fixing. Complying strictly with German DIN 3015 Part 2 heavy standard, it features a thick reinforced green PP plastic housing and full galvanized carbon steel fasteners, delivering stable clamping force, vibration resistance and long service life under harsh working conditions.The inner lined anti-slip ribbed cushion tightly wraps 18mm outer diameter tubes, effectively reducing pipeline vibration, noise and abrasion, widely applied in hydraulic power stations, engineering vehicles, industrial equipment and offshore mechanical piping systems.
18mm Heavy Series Pipe clamp DIN 3015, Part 2 Component List:
| Quantity | Part Name | Technical Details |
|---|---|---|
| 2 pcs | Hexagon Head Bolt | Surface: W1; Metric thread |
| 1 pc | Cover Plate for Single Clamps | Surface: W2 |
| 1 pc | Clamp Body (two halves) | STAUFF Group 3S (DIN 1) Fits tube OD: 6 mm / .24 in Material: Polypropylene Profiled inner surface with tension clearance |
| 2 pcs | Mounting Rail Nut | Surface: W3; Metric thread |
18mm Heavy Series Pipe clamp DIN 3015, Part 2 measurement and read pictures:




18mm Heavy Series Pipe clamp DIN 3015, Part 2 Application Scenarios
- Hydraulic power unit pipeline fixing
- Construction machinery & heavy engineering vehicle tubing
- Marine, ship and offshore industrial piping systems
- CNC machine tools, automation production lines
- Oil & gas, mining heavy equipment hydraulic circuits
- Agricultural large machinery hydraulic tube mounting
18mm Heavy Series Pipe clamp DIN 3015, Part 2 Packaging:

| Payment & Shipping Terms | Supply Capacity | ||
| Payment Term: | L/C, Western Union, D/P, T/T | Production Capacity: | 80000 Per Day |
| MOQ: | 500 Piece/Pieces | Packing: | 100/carton |
| Means of Transport: | Land, Ocean,Air | Delivery Date: | 15 working day |







